{"id":16278,"date":"2026-10-15T09:08:53","date_gmt":"2026-10-15T09:08:53","guid":{"rendered":"https:\/\/rjoytek.com\/"},"modified":"2026-10-15T09:08:55","modified_gmt":"2026-10-15T09:08:55","slug":"depannage-de-la-longueur-du-cable-lcd-lvds","status":"publish","type":"post","link":"https:\/\/rjoytek.com\/fr\/depannage-de-la-longueur-du-cable-lcd-lvds\/","title":{"rendered":"Longueur du c\u00e2ble LCD LVDS : Comment diagnostiquer le scintillement, les paillettes et les images intermittentes"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The LCD works with the short bench cable. After the controller board moves deeper into the enclosure and a longer harness is installed, colored sparkles appear. Sometimes the image drops out only when a motor starts or the cabinet warms up.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The longer cable is an important clue, but it is not a diagnosis. The replacement may have changed pin assignments, pair construction, connectors, grounding, and the power path as well as length. A useful investigation separates those changes before modifying the board.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This guide covers conventional panel LVDS links between a display controller and a TFT LCD. It helps OEM engineers distinguish compatibility errors from a marginal electrical link, compare cable assemblies, and prepare evidence for a display integration review. It does not cover eDP, MIPI DSI, or automotive serializer links as interchangeable technologies.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">1. First Separate Cable Problems from Configuration and Power Faults<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Before considering maximum cable length, preserve the working configuration. Record the panel model, controller-board revision, firmware version, timing settings, and short-cable part number. Photograph the installation and capture the failure. Then ask exactly what changed.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th class=\"has-text-align-left\" data-align=\"left\">Observation<\/th><th class=\"has-text-align-left\" data-align=\"left\">Useful first check<\/th><th class=\"has-text-align-left\" data-align=\"left\">What it does not prove<\/th><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\">Stable image with consistently incorrect colors<\/td><td class=\"has-text-align-left\" data-align=\"left\">Data mapping, bit depth, channel assignment, and pinout<\/td><td class=\"has-text-align-left\" data-align=\"left\">That the cable is too long<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Random sparkles or intermittent image corruption<\/td><td class=\"has-text-align-left\" data-align=\"left\">Contacts, supply stability, routing, and link signal quality<\/td><td class=\"has-text-align-left\" data-align=\"left\">That every symptom has the same electrical cause<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Backlight dims while image content remains present<\/td><td class=\"has-text-align-left\" data-align=\"left\">Backlight supply, enable, PWM control, and driver behavior<\/td><td class=\"has-text-align-left\" data-align=\"left\">That LVDS data is failing<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Image disappears during startup or load changes<\/td><td class=\"has-text-align-left\" data-align=\"left\">Panel-side supplies, reset, sequencing, and controller state<\/td><td class=\"has-text-align-left\" data-align=\"left\">That signal integrity is the only concern<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Use this table to choose the next measurement, not to assign a cause from appearance alone. An intermittent connector can resemble electrical noise. Supply disruption can reset a receiver and produce an apparent data-link failure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Check connector orientation and every circuit before powering a replacement harness. The same connector housing does not establish the same wiring. RJY\u2019s <a href=\"https:\/\/rjydisplay.com\/lcd-ribbon-cable-connector-fpc-guide\/\" rel=\"nofollow noopener\" target=\"_blank\">LCD cable and connector matching guide<\/a> covers those physical and pin-definition checks.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If corruption is repeatable and independent of routing or cable changes, review <a href=\"https:\/\/rjydisplay.com\/lvds-vesa-jeida-data-mapping\/\" rel=\"nofollow noopener\" target=\"_blank\">VESA and JEIDA data mapping<\/a> and the panel\u2019s channel configuration. Correcting a mapping mismatch and improving an electrically marginal link are different tasks.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">2. Why a Longer Harness Can Expose a Marginal Link<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">LVDS uses the voltage difference between two conductors. Differential signaling improves noise rejection, but the complete path still matters. TI\u2019s LVDS design guide discusses cables, connectors, grounding, termination, and measurement as parts of system design.<sup><a href=\"#ref-1\">[1]<\/a><\/sup><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Adding cable can increase loss and change the received waveform. Adding an adapter can introduce a separate discontinuity. Routing the new harness alongside a switching power stage adds another variable. A short cable may tolerate a weakness that the production installation exposes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">There is no universal maximum LVDS LCD cable length. Analog Devices\u2019 serializer study evaluates signal quality against transmission rate and cable length for a specific device and cable arrangement.<sup><a href=\"#ref-2\">[2]<\/a><\/sup> Its measured distances should not be copied into an unrelated panel specification.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The engineering question is whether the selected transmitter, receiver, and interconnect retain adequate margin at the required operating point. That requires the device specifications, cable construction, and representative validation. One successful desktop demonstration is insufficient evidence of a production limit.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">3. Review Impedance, Pair Geometry, and Timing Together<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A cable drawing should identify the differential pairs and their construction, not merely list conductor count. Look for a specified differential impedance, pair assignment, length, connector arrangement, and relevant skew requirements. Preserve the actual P and N pair through connectors and adapters.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Analog Devices\u2019 AN-1177 explains why impedance discontinuities, termination, jitter, and skew matter in LVDS implementation.<sup><a href=\"#ref-3\">[3]<\/a><\/sup> The practical review should distinguish two timing questions: how closely the conductors within each pair track one another, and how the received data channels align with the forwarded clock.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/lvds-lcd-cable-length-troubleshooting-01-cover.png\"><img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/lvds-lcd-cable-length-troubleshooting-01-cover-1024x576.png\" alt=\"Display cable secured along the interior of an industrial HMI enclosure.\" class=\"wp-image-16279\" title=\"\" srcset=\"https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/lvds-lcd-cable-length-troubleshooting-01-cover-1024x576.png 1024w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/lvds-lcd-cable-length-troubleshooting-01-cover-300x169.png 300w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/lvds-lcd-cable-length-troubleshooting-01-cover-768x432.png 768w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/lvds-lcd-cable-length-troubleshooting-01-cover.png 1672w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Display cable secured along the interior of an industrial HMI enclosure.<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">These are not interchangeable length-matching rules. The allowable mismatch depends on the devices and link timing. Do not apply a generic millimeter tolerance from a different board or serializer.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Likewise, a shield is not proof of an appropriate signal path. A shielded assembly can still have incorrect pair assignments, poor connector transitions, or unsuitable routing. Request the harness specification and inspect the entire path rather than selecting a cable by its outer appearance.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">4. Confirm Existing Termination and Grounding Before Changing Them<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A conventional point-to-point LVDS link commonly uses a receiver-end differential termination around 100 ohms, matched to the intended transmission path. The receiver may already include it.<sup><a href=\"#ref-3\">[3]<\/a><\/sup> The panel and controller documentation must determine the actual implementation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Do not add another resistor simply because a generic drawing shows one. Parallel termination changes the load seen by the driver. Check the receiver datasheet, schematic where available, and panel supplier\u2019s requirements before altering components.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A resistance reading on an unpowered assembly can be useful supporting evidence, but it is not a complete termination audit. Connected circuitry can affect the result. Measure only with the equipment powered down and discharged as required, and interpret the reading against the actual circuit.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Review signal grounds and any chassis or shield connection as separate design items. Differential reception does not remove common-mode limits or the need for the specified reference connections. Avoid improvised ground or shield changes; review them within the equipment\u2019s electrical and EMC design.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">5. Use a Controlled Short-Cable Comparison<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The most useful first experiment is reversible: restore the known-good short harness while keeping the panel, controller, firmware, power source, and image content unchanged. If the symptom remains, the original assumption needs revision.<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Confirm a repeatable baseline.<\/strong> Record the working and failing configurations, startup procedure, operating duration, and failure frequency.<\/li>\n\n\n\n<li><strong>Verify the replacement harness.<\/strong> Compare pin-to-pin wiring, pair assignments, grounds, power conductors, and connector retention with the approved drawing. Perform continuity checks without power.<\/li>\n\n\n\n<li><strong>Measure supplies at the panel.<\/strong> Compare startup and operating behavior at the receiving assembly. A stable reading at the controller does not establish a stable panel supply.<\/li>\n\n\n\n<li><strong>Change routing separately.<\/strong> Compare positions away from suspected noise sources without changing firmware or termination. Record the physical route.<\/li>\n\n\n\n<li><strong>Compare cable assemblies.<\/strong> Where available, use equivalent cable construction at different lengths. If construction also changes, describe the result as an assembly comparison rather than a pure length test.<\/li>\n\n\n\n<li><strong>Reproduce production conditions.<\/strong> Repeat the comparison with the intended enclosure, mounting, cable retention, and representative equipment loads.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">Power down before changing display connections unless the specific hardware explicitly supports the intended hot-plug procedure. Cable movement during an operating test should not compromise electrical safety or connector retention.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/lvds-lcd-cable-length-troubleshooting-03-harness-comparison.png\"><img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/lvds-lcd-cable-length-troubleshooting-03-harness-comparison-1024x576.png\" alt=\"Short and longer display cable assemblies arranged for a controlled comparison.\" class=\"wp-image-16282\" title=\"\" srcset=\"https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/lvds-lcd-cable-length-troubleshooting-03-harness-comparison-1024x576.png 1024w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/lvds-lcd-cable-length-troubleshooting-03-harness-comparison-300x169.png 300w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/lvds-lcd-cable-length-troubleshooting-03-harness-comparison-768x432.png 768w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/lvds-lcd-cable-length-troubleshooting-03-harness-comparison-1536x864.png 1536w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/lvds-lcd-cable-length-troubleshooting-03-harness-comparison-18x10.png 18w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/lvds-lcd-cable-length-troubleshooting-03-harness-comparison-640x360.png 640w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/lvds-lcd-cable-length-troubleshooting-03-harness-comparison.png 1672w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Short and longer display cable assemblies arranged for a controlled comparison.<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Use suitable test content, including static color fields, fine patterns, and changing images. Record which patterns reveal the problem. A test pattern that looks clean establishes behavior under that condition; it does not certify timing margin or EMC performance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A lower-rate test can help only if both the controller and panel support that operating point. Reducing refresh rate does not automatically reduce the relevant link rate in every architecture. Do not operate the panel outside its approved timing range to obtain a passing image.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">6. Measure the Receiver Conditions Without Creating a New Problem<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">When substitution tests leave uncertainty, inspect the electrical signal using equipment appropriate for the link. The important waveform is the one reaching the receiver, not only the one leaving the transmitter.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Use suitable low-loading differential probing and a connection method that preserves the path being measured. Long probe attachments, added stubs, or unsuitable probes can disturb a marginal link. TI\u2019s guide includes probing and measurement considerations for LVDS systems.<sup><a href=\"#ref-1\">[1]<\/a><\/sup><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Compare the short and long assemblies at equivalent test points and operating conditions. Assess differential amplitude, waveform shape, timing variation, and common-mode behavior against the actual receiver limits. Where an eye measurement is appropriate, use the correct trigger and acquisition method for the link.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/lvds-lcd-cable-length-troubleshooting-04-measurement-context.png\"><img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/lvds-lcd-cable-length-troubleshooting-04-measurement-context-1024x576.png\" alt=\"Differential probe positioned at an accessible display interface test area.\" class=\"wp-image-16283\" title=\"\" srcset=\"https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/lvds-lcd-cable-length-troubleshooting-04-measurement-context-1024x576.png 1024w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/lvds-lcd-cable-length-troubleshooting-04-measurement-context-300x169.png 300w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/lvds-lcd-cable-length-troubleshooting-04-measurement-context-768x432.png 768w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/lvds-lcd-cable-length-troubleshooting-04-measurement-context-1536x864.png 1536w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/lvds-lcd-cable-length-troubleshooting-04-measurement-context-18x10.png 18w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/lvds-lcd-cable-length-troubleshooting-04-measurement-context-640x360.png 640w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/lvds-lcd-cable-length-troubleshooting-04-measurement-context.png 1672w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Differential probe positioned at an accessible display interface test area.<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">A visually open eye is useful evidence, but an improvised eye diagram is not an automatic compliance result. Define the relevant acceptance criteria and measurement setup. Include probe details, bandwidth, test point, image pattern, cable configuration, and environmental condition in the report.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If attaching the probe makes the failure disappear or become worse, record that observation. It can indicate a sensitive link or a measurement artifact; it should not be silently treated as the original unprobed behavior.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">7. Decide Whether to Improve the Harness or Revisit the Architecture<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">If evidence points to the interconnect, review a purpose-specified harness, fewer adapter transitions, improved routing, and connector retention. Validate each change in the final installation. A cable that merely works once is not a substitute for a controlled production part.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If the required distance or environment exceeds what the selected panel link can reliably support, reassess board placement or an engineered transport solution. Any active conversion or extension needs review of the complete pixel format, clocking, channel arrangement, electrical requirements, power, and startup behavior. A generic LVDS buffer is not automatically suitable for an entire display link.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For RJY Display projects, start with the panel model and its datasheet, then review the controller and interconnect as a system. Controller-board and firmware adaptation are project dependent. RJY can review display integration requirements without implying universal compatibility or a guaranteed cable reach.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The goal is an approved combination of panel, controller, firmware, harness, and installation\u2014not a standalone claim that a certain cable length always works.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">8. Frequently Asked Questions<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">What is the maximum LVDS LCD cable length?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">There is no universal maximum. Usable length depends on the transmitter, receiver, link rate, cable construction, connectors, grounding, and operating environment. Validate the complete combination against the relevant device specifications.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Do colored sparkles prove that the LVDS cable is too long?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">No. Sparkles can justify checking link quality, but contacts, wiring, power, configuration, and other faults can also affect the image. Compare a verified short harness and change one variable at a time.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Should I add a 100-ohm resistor to fix flicker?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">First confirm the required termination and whether the receiver already includes it. Adding another resistor can change the driver load. Follow the panel and device documentation rather than a generic circuit example.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Will shielding alone fix an unstable LVDS display?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Not necessarily. Correct pair assignments, cable impedance, connector transitions, timing, reference connections, and power still matter. Shielding must be evaluated as part of the complete equipment design.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What should I send for an LVDS display integration review?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Provide the panel datasheet, controller model and firmware, timing settings, harness drawing and length, pinout, installation photos, panel-side power measurements, and a description of the working and failing configurations.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Request an LVDS Integration Review<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Prepare the short-versus-long comparison before requesting a different controller or cable. Include the exact parts and conditions so the review can focus on compatibility, interconnect construction, or measured link behavior. Use RJY\u2019s <a href=\"https:\/\/rjydisplay.com\/lcd-ribbon-cable-connector-fpc-guide\/\" rel=\"nofollow noopener\" target=\"_blank\">LCD connection review guide<\/a> to organize the drawings and panel information for engineering discussion.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">References<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Texas Instruments. <a href=\"https:\/\/www.ti.com\/lit\/ug\/snla187\/snla187.pdf\" rel=\"nofollow noopener\" target=\"_blank\">LVDS Owner\u2019s Manual, Fourth Edition<\/a>. General LVDS system design and measurement guidance; device-specific documentation remains controlling.<\/li>\n\n\n\n<li>Analog Devices. <a href=\"https:\/\/www.analog.com\/en\/resources\/technical-articles\/signal-integrity-vs-transmission-rate-and-cable-length-for-lvds-serializers.html\" rel=\"nofollow noopener\" target=\"_blank\">Signal Integrity vs. Transmission Rate and Cable Length for LVDS Serializers<\/a>. Results apply to the documented serializer and test arrangement, not every LCD link.<\/li>\n\n\n\n<li>Analog Devices. <a href=\"https:\/\/www.analog.com\/en\/resources\/app-notes\/an-1177.html\" rel=\"nofollow noopener\" target=\"_blank\">AN-1177: LVDS and M-LVDS Circuit Implementation Guide<\/a>. General physical-layer guidance; M-LVDS bus examples are not panel LVDS wiring instructions.<\/li>\n<\/ol>\n","protected":false},"excerpt":{"rendered":"<p>The LCD works with the short bench cable. After the controller board moves deeper into the enclosure and a longer harness is [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[425],"tags":[],"class_list":["post-16278","post","type-post","status-publish","format-standard","hentry","category-tft-basics"],"_links":{"self":[{"href":"https:\/\/rjoytek.com\/fr\/wp-json\/wp\/v2\/posts\/16278","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rjoytek.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rjoytek.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rjoytek.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/rjoytek.com\/fr\/wp-json\/wp\/v2\/comments?post=16278"}],"version-history":[{"count":1,"href":"https:\/\/rjoytek.com\/fr\/wp-json\/wp\/v2\/posts\/16278\/revisions"}],"predecessor-version":[{"id":16284,"href":"https:\/\/rjoytek.com\/fr\/wp-json\/wp\/v2\/posts\/16278\/revisions\/16284"}],"wp:attachment":[{"href":"https:\/\/rjoytek.com\/fr\/wp-json\/wp\/v2\/media?parent=16278"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rjoytek.com\/fr\/wp-json\/wp\/v2\/categories?post=16278"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rjoytek.com\/fr\/wp-json\/wp\/v2\/tags?post=16278"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}