{"id":16271,"date":"2026-10-15T07:50:25","date_gmt":"2026-10-15T07:50:25","guid":{"rendered":"https:\/\/rjoytek.com\/"},"modified":"2026-10-15T07:50:27","modified_gmt":"2026-10-15T07:50:27","slug":"marktausblick-fur-paketstationen-displays-2026","status":"publish","type":"post","link":"https:\/\/rjoytek.com\/de\/marktausblick-fur-paketstationen-displays-2026\/","title":{"rendered":"Marktausblick f\u00fcr Paketstation-Displays 2026: Wo Bildschirme noch Mehrwert bieten"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">A parcel locker network can grow rapidly while the display opportunity becomes more selective. Some stations guide customers through a local touchscreen. Others move the interaction to a phone and remove the screen entirely. For display buyers and suppliers, counting cabinets is only the beginning.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The more useful question is which locker workflows justify a local interface. A screen may help customers complete a return, understand why a compartment has not opened, or follow instructions without switching devices. Its value depends on whether the operator needs those functions at the station and can support them economically.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This outlook examines European parcel collection, dispatch, and return lockers. It connects network expansion with TFT LCD, touch, and controller-board decisions, while treating screenless designs as a real alternative. The central judgment is that suppliers should prioritize defined equipment programs and user tasks rather than assume every new locker requires a display.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Evidence boundary:<\/strong> Operator disclosures provide network context and examples of deployed interaction models. They do not measure the parcel locker display market. Historical figures below are explicitly dated; the discussion of display opportunities is qualitative analysis, not a forecast of 2026 shipments or market share.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">1. Network Growth Does Not Equal Display Demand<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">InPost\u2019s annual financial data lists 61,196 automated parcel machines (APMs) at the end of 2025, compared with 46,955 at the end of 2024\u2014an increase of approximately 30%. The same table distinguishes APMs from the wider out-of-home network, which includes other collection points.<sup><a href=\"#ref-1\">[1]<\/a><\/sup><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Those figures demonstrate expansion within one operator\u2019s network. They are not a count of all European lockers, screens shipped, or displays purchased that year. A locker installation can contain a central control unit and additional compartments without a separate screen for each section. Changes in installed network totals also need to be distinguished from equipment procurement and component deliveries.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For a display supplier, demand comes through several routes: newly manufactured screen-equipped stations, replacement displays for existing equipment, and redesigned control units. Each route has different requirements. New platforms may permit a change of panel format; field replacements often need to preserve mechanical fit and established software behavior.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Therefore, an opportunity estimate needs the equipment configuration, planned production, screen attachment rate, and replacement assumptions. Public network figures can identify an operator or region worth investigating. They cannot supply those missing variables.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">2. Screen-Based and Screenless Architectures Serve Different Priorities<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">DHL documents a Packstation format operated through the Post &amp; DHL App rather than a display on the station.<sup><a href=\"#ref-2\">[2]<\/a><\/sup> This establishes that a functioning parcel locker service can use a screenless architecture. It does not establish that every location or customer journey should use one.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Removing a local display changes the allocation of work. The customer\u2019s phone becomes the primary interface, and the service must support the required app, authentication, and communication flow. A screen-equipped station puts more guidance at the physical location but adds hardware, power use, software support, and another field-service component.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th class=\"has-text-align-left\" data-align=\"left\">Architecture<\/th><th class=\"has-text-align-left\" data-align=\"left\">Potential advantage<\/th><th class=\"has-text-align-left\" data-align=\"left\">Dependency to assess<\/th><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\">Local touchscreen<\/td><td class=\"has-text-align-left\" data-align=\"left\">Instructions and interaction remain at the station<\/td><td class=\"has-text-align-left\" data-align=\"left\">Readable installation, touch usability, secure sessions, and service access<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Phone-operated, screenless station<\/td><td class=\"has-text-align-left\" data-align=\"left\">Removes the local interactive display assembly<\/td><td class=\"has-text-align-left\" data-align=\"left\">Supported phone workflow, communication requirements, and assistance options<\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\">Hybrid station<\/td><td class=\"has-text-align-left\" data-align=\"left\">Can divide tasks between phone and local interface<\/td><td class=\"has-text-align-left\" data-align=\"left\">Consistent state, clear handoffs, and sufficient value to justify both interfaces<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">These are design trade-offs, not universal performance rankings. A hybrid system can improve flexibility, but two interfaces can also create contradictory instructions. The OEM should specify which device owns each step and what happens when the devices disagree or lose communication.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A local screen is not automatically an offline fallback. If authentication and compartment authorization still depend on a remote service, the screen can explain an outage without enabling collection. Buyers should separate communication of a failure from recovery of the underlying service.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-02-screenless-station.png\"><img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-02-screenless-station-1024x576.png\" alt=\"Customer using a phone beside a parcel locker station without a built-in screen.\" class=\"wp-image-16273\" title=\"\" srcset=\"https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-02-screenless-station-1024x576.png 1024w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-02-screenless-station-300x169.png 300w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-02-screenless-station-768x432.png 768w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-02-screenless-station-1536x864.png 1536w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-02-screenless-station-18x10.png 18w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-02-screenless-station-640x360.png 640w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-02-screenless-station.png 1672w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Customer using a phone beside a parcel locker station without a built-in screen.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">3. Collection, Dispatch, and Returns Create Different Interface Work<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A straightforward collection may require only identification and the opening of an assigned compartment. Dispatch and returns can introduce additional choices: selecting a service, confirming a parcel, choosing a suitable compartment, or following a carrier-specific process. The actual sequence depends on the operator\u2019s service design.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">DHL\u2019s out-of-home research discusses parcel lockers and parcel shops together in parts of its delivery and returns analysis.<sup><a href=\"#ref-3\">[3]<\/a><\/sup> For display planning, that combined category needs care. A staffed parcel shop and an unattended locker have different assistance models, and evidence about the combined channel does not establish demand for locker screens.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The strongest local-screen case arises where the station must explain a decision or exception at the moment of use. Consider a customer who selected a compartment that is too small. The system needs to explain the permitted next step, preserve the correct transaction, and avoid leaving an ambiguous open session. A display can present that guidance, but the backend and locker controller must support the procedure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Likewise, a \u201cdoor open\u201d animation must reflect actual compartment status. The LCD does not verify the lock or door. The application needs reliable status inputs and defined behavior when a sensor, mechanism, or connection fails.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This makes the interface specification a workflow document before it becomes a panel specification. Map the normal journey, the exceptions, and the points where users need help. Then decide whether those instructions belong on a phone, the locker, or another support channel.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-03-local-interface.png\"><img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-03-local-interface-1024x576.png\" alt=\"Local parcel locker touchscreen beside an open compartment containing a cardboard parcel.\" class=\"wp-image-16274\" title=\"\" srcset=\"https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-03-local-interface-1024x576.png 1024w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-03-local-interface-300x169.png 300w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-03-local-interface-768x432.png 768w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-03-local-interface-1536x864.png 1536w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-03-local-interface-18x10.png 18w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-03-local-interface-640x360.png 640w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-03-local-interface.png 1672w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Local parcel locker touchscreen beside an open compartment containing a cardboard parcel.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">4. Where a Local Display Deserves Closer Evaluation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A public location with varied users and several services may have a stronger reason to provide local guidance than a narrowly defined, phone-based collection service. That is a hypothesis for project evaluation, not evidence that all public stations need screens.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Evaluate the screen against the intended user population. Can customers find the relevant action, understand the instructions, and reach the controls? Are language choices necessary? Does the layout work for the installation height and viewing conditions? Screen size alone does not answer those questions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Physical design matters as much as interface content. A large panel mounted too high or behind strong reflections may be harder to use than a smaller, well-positioned panel. Controls should remain legible and practical at the expected viewing distance, with the complete installation assessed for the applicable accessibility requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For mixed-carrier or multi-service equipment, a flexible screen layout may support different workflows. However, the buyer must identify who maintains those layouts and approves changes. A configurable display surface does not provide carrier integrations or operational governance by itself.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A useful pilot measures completion, requests for help, abandoned sessions, and error recovery. It should also record location traffic, service mix, and software changes. Otherwise, a change in usage may be incorrectly attributed to the screen.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">5. Outdoor Readability, Power, and Maintenance Affect the Economics<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A parcel locker display can operate indoors, under a canopy, or in a fully exposed location. Each setting needs its own specification. The term \u201coutdoor display\u201d is too broad to establish brightness, temperature capability, enclosure protection, or service life.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Specify the front assembly<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Assess readability with the proposed cover glass, bezel, viewing angle, and ambient light. More backlight output can increase power and thermal demands without eliminating reflections. Review the optical assembly and installation together before selecting a brightness target.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Touch validation should include the conditions the operator actually requires. Rain exposure, wet fingers, gloves, and contamination should not be treated as capabilities implied by a touch technology name. The sensor, controller, tuning, grounding, glass, and mechanical installation influence the result.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Protection ratings and environmental claims must apply to the relevant assembly and supporting tests. A panel\u2019s component specification does not establish the sealing or impact resistance of the finished cabinet.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Include operating states and field service<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Power evaluation should cover idle operation, active sessions, dimming, and wake behavior. If the screen sleeps, users still need to recognize how to begin. Savings depend on the real duty cycle and the complete electronics, not only the LCD\u2019s nominal consumption.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Maintenance can determine whether a seemingly attractive upgrade is affordable. Review access to the display, cable retention, replacement time, spare-part control, and software restoration. A station with many compartments may concentrate customer interaction in one control unit; the consequences of that unit failing deserve explicit consideration.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">6. Where Display and Controller Suppliers Can Add Value<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For a screen-equipped platform, customization often starts with a suitable existing LCD module. The work can then focus on fitting the front panel, achieving the required optical behavior, integrating touch, routing the FPC, and matching the controller arrangement.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">RJY Display supports project-specific customization based mainly on existing display modules, including cover glass, backlight, touch, interface, FPC, controller board, firmware, and mechanical coordination. The feasible scope requires review of the selected module and equipment requirements. This does not imply development of any new LCD panel size on demand.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Controller matching needs more than an interface label. Review the panel model, resolution, pin definition, timing, power, and backlight requirements. Touch adds its own controller, connection, and driver dependencies. Firmware adaptation remains project dependent.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The display subsystem also has a clear boundary. It does not replace identity management, parcel-service software, secure authorization, lock control, or equipment-level validation. The OEM and system integrator must define how these functions communicate and recover from failures.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-04-service-assembly.png\"><img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-04-service-assembly-1024x576.png\" alt=\"Rear display assembly and controller board mounted inside a parcel locker control door.\" class=\"wp-image-16275\" title=\"\" srcset=\"https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-04-service-assembly-1024x576.png 1024w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-04-service-assembly-300x169.png 300w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-04-service-assembly-768x432.png 768w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-04-service-assembly-1536x864.png 1536w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-04-service-assembly-18x10.png 18w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-04-service-assembly-640x360.png 640w, https:\/\/rjoytek.com\/wp-content\/uploads\/2026\/10\/parcel-locker-display-market-outlook-2026-04-service-assembly.png 1672w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Rear display assembly and controller board mounted inside a parcel locker control door.<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">RJY\u2019s <a href=\"https:\/\/rjydisplay.com\/industry\/displays-for-iot\/\" rel=\"nofollow noopener\" target=\"_blank\">IoT display application page<\/a> includes smart express lockers as an application context. A specific project should proceed from its own architecture and environmental requirements, followed by validation in a representative cabinet assembly.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">7. An OEM Decision Framework for 2026<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The practical buying decision is whether a local screen improves a defined service enough to justify its total cost. Evaluate that before fixing panel size or requesting a customized front cover.<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Define the service.<\/strong> Separate collection, dispatch, returns, and maintenance tasks. Identify the intended users and deployment conditions.<\/li>\n\n\n\n<li><strong>Compare architectures.<\/strong> Evaluate local-screen, phone-operated, and hybrid workflows against the same tasks and failure scenarios.<\/li>\n\n\n\n<li><strong>Specify state ownership.<\/strong> Assign authentication, authorization, compartment status, session completion, and assistance messages to the correct systems.<\/li>\n\n\n\n<li><strong>Validate the assembly.<\/strong> Review readability, touch response, electrical compatibility, mechanical fit, environmental exposure, and service access.<\/li>\n\n\n\n<li><strong>Build the lifecycle case.<\/strong> Include development, software support, power, installation, replacement labor, spares, and component-change management.<\/li>\n\n\n\n<li><strong>Pilot with agreed measures.<\/strong> Compare task completion and operating effort with a suitable baseline before wider deployment.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">For suppliers, the most promising opportunities are equipment programs where these decisions are sufficiently defined to support a real specification. Network expansion provides context. The chosen architecture and operating economics determine whether that expansion creates display orders.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">8. Frequently Asked Questions<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Does every parcel locker need a touchscreen?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">No. Some lockers use a local touchscreen, while others operate through a phone app. The appropriate architecture depends on the service workflow, users, communication requirements, and operating costs.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Can parcel locker network growth be converted directly into display shipments?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">No. Network totals do not reveal screen attachment rates, cabinet configurations, replacement demand, or component delivery timing. A display estimate needs equipment-level procurement assumptions.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Does a local screen make a parcel locker work offline?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">No. Offline operation depends on authentication, authorization, communication, and locker-control design. A screen may explain a connection failure without enabling the transaction to continue.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What should an OEM verify for an outdoor locker display?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Verify assembled readability, touch behavior, electrical compatibility, power and thermal requirements, mechanical fit, environmental protection, and field replacement procedures under the intended installation conditions.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Can RJY Display customize a parcel locker display assembly?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">RJY Display supports project-specific customization based mainly on existing display modules. Cover glass, backlight, touch, interface, FPC, controller board, firmware, and mechanical coordination can be reviewed against the equipment requirements.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Discuss a Parcel Locker Display Project<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Share the cabinet drawing or existing panel datasheet, target screen role, host interface, touch requirements, deployment environment, and expected demand. Explain which tasks remain on the locker and which use a phone. <a href=\"https:\/\/rjydisplay.com\/industry\/displays-for-iot\/\" rel=\"nofollow noopener\" target=\"_blank\">Discuss your smart locker display requirements with RJY Display<\/a> to review an existing module and the adaptation scope your equipment needs.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">References<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li>InPost. <a href=\"https:\/\/inpost.eu\/investors\/financial-results\" rel=\"nofollow noopener\" target=\"_blank\">Financial Results \u2014 Annual Key Ratios and KPIs<\/a>. Historical APM and out-of-home network totals for 2024 and 2025; single-operator data.<\/li>\n\n\n\n<li>DHL. <a href=\"https:\/\/www.dhl.de\/en\/privatkunden\/pakete-empfangen\/an-einem-abholort-empfangen\/packstation\/packstation-kompakt.html\" rel=\"nofollow noopener\" target=\"_blank\">The New DHL Packstation<\/a>. Operator instructions describing app-operated stations without a local display.<\/li>\n\n\n\n<li>DHL eCommerce. <a href=\"https:\/\/www.dhl.com\/global-en\/microsites\/ec\/ecommerce-insights\/insights\/e-commerce-logistics\/out-of-home-trends.html\" rel=\"nofollow noopener\" target=\"_blank\">Out-of-Home Delivery and Returns Trends<\/a>. Consumer research covering parcel lockers and parcel shops; not a display shipment study.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A parcel locker network can grow rapidly while the display opportunity becomes more selective. Some stations guide customers through a local touchscreen. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":16272,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[185],"tags":[],"class_list":["post-16271","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-application"],"_links":{"self":[{"href":"https:\/\/rjoytek.com\/de\/wp-json\/wp\/v2\/posts\/16271","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rjoytek.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rjoytek.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rjoytek.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/rjoytek.com\/de\/wp-json\/wp\/v2\/comments?post=16271"}],"version-history":[{"count":1,"href":"https:\/\/rjoytek.com\/de\/wp-json\/wp\/v2\/posts\/16271\/revisions"}],"predecessor-version":[{"id":16276,"href":"https:\/\/rjoytek.com\/de\/wp-json\/wp\/v2\/posts\/16271\/revisions\/16276"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rjoytek.com\/de\/wp-json\/wp\/v2\/media\/16272"}],"wp:attachment":[{"href":"https:\/\/rjoytek.com\/de\/wp-json\/wp\/v2\/media?parent=16271"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rjoytek.com\/de\/wp-json\/wp\/v2\/categories?post=16271"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rjoytek.com\/de\/wp-json\/wp\/v2\/tags?post=16271"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}